In SituIn its original position or place. |
IncompatibleRelates to goods which when mixed or otherwise brought into contact with each other, are likely to interact and increase risk because of the interaction. |
Inhibited EmulsionEmulsion that has been rendered less sensitive to reactive ground through the addition of inhibiting chemical. |
Initiating SystemsBlasting components which provide the transmission of signal, control of delay timing and the initial explosive energy within the blast hole. |
Initiation PlanHard copy or electronic plan showing all the blast hole positions and the initiation system with all connections and products specified. BlastPlan is the premier initiation design application available. www.blastplan.com.au |
Initiation PointThe location of the first hole in a blast to fire. Also the point at which the lead in line is attached to the pattern. |
Inter-row TimingIs the delay time between rows. |
Intra-row TimingIs the delay time between holes within a row. |
J Clip |
Job Hazard AnalysisJob safety analysis (JSA), also known as job hazard analysis (JHA), is a safety management tool in which the risks or hazards of a specific job in the workplace are identified, and then measures to eliminate or control those hazards are determined and implemented. The JSA process begins with identification of the potential hazards or risks associated with a particular job. Once the hazards are understood, the consequences of those hazards are then identified, followed by control measures to eliminate or mitigate the hazards. The end result of a JSA is an easy to understand document that can be shared with workers as part of pre-job and safety meetings, and/or included as part of worker job descriptions. The JSA process can be used to help refine safe work procedures described in safety manuals or standard operating procedures, and the JSA document can serve as a useful tool in training new employees.
|

