Glossary


glossary

Browse the glossary using this index

Special | A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | ALL

Page:  1  2  3  4  (Next)
  ALL

P

Packaged Explosive

Explosives that is pre packaged into plastic, card or paper tubes.

maxam PE

 

 

Entry link: Packaged Explosive

Parallel

Two or more (straight) lines, (flat) surfaces equally distant from one another at all points.

Entry link: Parallel

PCF

The PCF tube is a hollow plastic tube, open at one end which can then be filled with the powdered smokeless propellant and then closed with a small cap. The other end is machined into a wedge to lock into the stemming, and to seal the hole when inserted for ignition. In the cap there is an entry port for insertion of an electric match, which is the means of detonation. This heat ignites the propellant. As there are not the crushing effects of compressive breakage as with explosives, dust and fines are significantly reduced. As the rock requires less energy to break in tension than compression, a much smaller energy input is recquired. A 200 g charge of PCF blasts the same volume of rock as does 1.2 kg of explosive charge, whilst releasing one tenth of the energy. The product has been found to be particularly useful in deep South African mines as it’s low toxicity reduces re-entry time in these hard to ventilate mines thus improving productivity by up to 40 % (Minesite News, 2000). Some gas is produced from the combustion of the cartridge, for PCF, the majority of the gases produced are carbon dioxide, water, nitrogen, carbon monoxide and hydrogen. The main problem gases which are detectable are carbon monoxide, and nitrous oxide which also occurs at low levels. The addition of a very small amount of ANFO prill does increase the toxic fumes from the product, but still below minimal levels in modern ventilation systems. This gives the product a little extra power to fragment the rock. The product also has the ability to enable users to have more control over the accuracy of the excavation profile and drive perimeters. PCF has also been used in floor stripping, back stripping and side wall stripping in a number of mines in Australia, particularly when a larger equipment size is required and minimal disruption to underground operations is essential. By altering the position of the charges in the holes the products flexibility allows for the rock to be fractured or split. PCF can also be used for the clearing of block grizzlies, crushers or chutes, or anywhere else where oversize is a problem.
The classification for PCF is 1.4S pyrotechnic, as an added safety precaution, the electric match used for detonation is inserted right before firing.

pcf

Entry link: PCF

Peak Particle Velocity

The rate at which a particle of ground is moving, i.e. a measure of ground vibration, in millimetres per second.

Entry link: Peak Particle Velocity

Pentolite

Pentolite is a high explosive used for military and civilian purposes e.g. warheads and booster charges.

Military pentolite comprises a mixture of 50% PETN and 50% TNT. A 50:50 mixture has a density of 1.65 g/cm3 and a detonation velocity of 7400 m/s. Civilian pentolite sometimes contains a lower percentage of PETN. Civilian pentolite has a detonation velocity of approximately 7,800 metres per second.

Entry link: Pentolite

Perforating Charge

A perforating charge is a type of shaped charge used in the well industry to perforate casings and allow fluids to flow into the well.

A perforating charge is assembled from four components: case, main explosive pellet, primer, and liner.

perf charge 4

When the explosives detonated the metal liner collapses into a high speed jet that perforated the well lining.

Entry link: Perforating Charge

Perforating Gun

A perforation in the context of oil wells refers to a hole punched in the casing or liner of an oil well to connect it to the reservoir. In cased hole completions, the well will be drilled down past the section of the formation desired for production and will have casing or a liner run in separating the formation from the well bore. The final stage of the completion will involve running in perforating guns, a string of shaped charges, down to the desired depth and firing them to perforate the casing or liner. A typical perforating gun can carry many dozens of charges.

 Commonly, perforation guns are run on E-line as it is traditional to use electrical signals from the surface to fire the guns.

perf gun 5

Entry link: Perforating Gun

Perforation

A perforation in the context of water, oil and gas wells refers to a hole punched in the casing or liner of an oil well to connect it to the reservoir. In cased hole completions, the well will be drilled down past the section of the formation desired for production and will have casing or a liner run in separating the formation from the well bore. The final stage of the completion will involve running in perforating guns, a string of shaped charges, down to the desired depth and firing them to perforate the casing or liner. A typical perforating gun can carry many dozens of charges.

Commonly, perforation guns are run on E-line as it is traditional to use electrical signals from the surface to fire the guns. In more highly deviated wells, coiled tubing may be used. Newer technologies allow the guns to be run on slickline. Modern slickline technology embeds fiber optic lines that can transmit two-way data on real-time temperature, pressure and seismic responses along the length of the slickline. This information allows very precise operations of various down hole tools, including perforation guns.

The benefit of this strategy is greater deal of control of the well. Casing the bottom of the hole allows the well to be completed without having to worry about reservoir fluids. It also allows precise selection of where in the formation production will be and to be able to seal off perforations, which are no longer useful or counterproductive, through cementing or straddling.

The disadvantage is that perforating can lead to "skin damage", where debris from the perforations can hinder productivity of the well. In order to mitigate this, perforating is commonly done underbalanced (lower pressure in the well bore than in the formation) as the higher well bore pressure will cause a surge of fluids into the well at the point of perforating, hopefully carrying the debris with it. Other methods of stimulation such as acidising and proppant fracturing are often required to overcome this damage and bring the well up to its full potential.

Casing and perforating as a method of completion is common place nowadays, though in some unconsolidated formations, prone to production of sand ( BP Harding as an example), open hole completions, using only sandscreens, may be the preferred choice.

Oil Well Perforation may be basically classified in two types a) Over-balanced Perforating and b) Under-balanced Perforating. Overbalanced perforating is normally carried out with the help of Perforating Guns or Hollow carriers. In Over -balanced Perforation the weight of the Well-bore Column is more than the Reservoir Pressure, thus it normally, ensures that the Well does not start flowing oil or Gas immediately after Perforation. However, it may have the effect of damaging the formation due to forced entry of well-bore fluid (mud) into the reservoir.

Entry link: Perforation

Perimeter Blasting

The techniques involving drill holes around or on the perimeter of an excavation, generally closely spaced, with the purpose of providing a predetermined face.

Entry link: Perimeter Blasting

Perimeter Product

A decoupled packaged explosive often traced with detonating cord for presplit and smoothwall blasting in hole diameters between 32mm and 127mm diameter.

econotrim

Entry link: Perimeter Product

Personal Protective Equipment (PPE)

Items of clothing or devices worn to protect an individual from the actual or potential risks to health or safety arising from an activity or process.

Entry link: Personal Protective Equipment (PPE)

PETN

PETN is a white powder and is one of the most powerful high explosives known, with a relative effectiveness factor of 1.66. In commercial explosives PETN is used as the base charge of detonators, the explosives core of most detonating cords and in cast Pentolite boosters.

PETN is impact sensitive.

 PETN mixed with a plasticizer forms a plastic explosive.

Entry link: PETN

Plain Detonator

A plain detonator consists of an open aluminium shell and a primary and base charge.

The primary charge is generally ASA, Lead Azide, Lead Styphnate and Aluminium a mixture very sensitive to F.I.S.H.

Plain detonators are crimped onto safety fuse to provide a delay detonator.

The presence of exposed primary explosives increase the risk of accidental initiation.

plain det

Entry link: Plain Detonator

Plane Failure

Plane failures in rock slopes occur when a geological discontinuity strikes parallel or nearly parallel to the slope face and dips at an angle greater than the angle of internal friction. Unlike a wedge failure only a single sliding joint is involved.

plane fail gloss

Entry link: Plane Failure

Plaster Shooting

The breaking of rocks or other materials by firing charges that have been placed against them and that have been confined by mud or clay.

Entry link: Plaster Shooting

Plastic

Of material – that which will deform before breaking.

Entry link: Plastic

Politically Motivated Violence Check

A security assessment in respect of a person, issued by Australian Security and Intelligence Organisation (ASIO). This is an ongoing check that is updated if there is a change in status.

Entry link: Politically Motivated Violence Check

Post-blast Gases

Gases generated by the detonation of explosives during blasting.

Entry link: Post-blast Gases

Potential Explosion Site (PES)

A location that could be the source of an explosion.

Entry link: Potential Explosion Site (PES)

Powder Factor (PF)

Powder Factor is generally the kg of explosives loaded divided by the cubic metres or tonnes of rock broken.

PF = Explosives (kg) / Rock Volume (m3)

Powder factor can be calculated for a range of scenarios as follows:

Powder Factor   Explosives Mass Volume of material (yield)
       

Concept PF

Average parameter inputs to drill pattern and charge pattern

 

kg in a single hole

=pi() * diameter ^2/4000 *explosives density

in-situ material broken by a single hole

burden * spacing * bench height

       
Design PF   kg in blast from load sheet summary m3 in blast from drill pattern design lines
       
As-built (actual) powder factor   kg loaded from explosives delivery records

m3 blasted from survey volumes

 

There is also a Target Powder Factor defined. This is generally derived from the planning process based on budget constraints.

Note that some sites use kg/tonne instead of kg/m3.

Entry link: Powder Factor (PF)

Pre-Splitting

A method of controlled blasting in which the line holes are fired prior to the main charge to create a crack to prevent disturbance beyond the final batter line.

presplit

Entry link: Pre-Splitting

Precursor

Precursor - A material consisting of fuels and oxidisers that are mixed and where the material is intended to be used exclusively in the production of an explosive. In order for such substances to be categorised as a precursor, evidence shall be produced demonstrating that the substance cannot cook-off leading to a mass violent reaction.

An example of an explosives precursor is ungassed emulsion.

ungassed emulsion

As precursors can be shown not to detonate they are generally classed as 5.1 Oxidising Agents and not as a 1.1D explosive.

To change a 5.1 precursor into an 1.1D explosive a sensitiser must be added. This is generally in the form of nitrogen bubbles (gassing) which will reduce the density to below 1.3 g/cc.

Entry link: Precursor

Primary Charge

An explosive, sensitive to spark, flame, impact or friction, used in a detonator to initiate the explosion.

Entry link: Primary Charge

Primer

A booster or cartridge carrying a detonator or coupled to a detonating cord by which the remainder of the charge is detonated
made up primer

Primer made up using cast booster

primer 25mm PE

Primer using small diameter packaged explosives

primed hole

A primed hole - the first primer is loaded, the second is still at the collar.

Entry link: Primer

Process Building

A building on premises licensed for the manufacture or storage of explosives, other than for immediate use, in which any explosive is manufactured or any ingredient of explosive is used in a manufacturing process.

Entry link: Process Building

Process Mapping

Benefits of process mapping

Process mapping spotlights waste, streamlines work processes and builds understanding. Process mapping allows you to visually communicate the important details of a process rather than writing extensive directions.

Specific benefits include:

  • Enables understanding of the process. Without understanding attempts at improvement will have random outcomes.

  • Complexity of processes and lack of understanding constrains management’s attempts to improve processes

  • Analytical skills and process mapping skills allow us to understand and communicate processes to management, staff and users

  • Identification of efficiency issues and where systems can support these.

  • Enables concise and consistent documentation to be developed. Includes procedures, work instructions, standards and training systems.

Entry link: Process Mapping

Process Step

A process step in a process generally refers to a change or transition.

Process steps are triggered by an input and deliver an output different to the input (the transition). Often there is a feedback loop to trigger the process again if the output does not meet a specific standard.

Process step

Entry link: Process Step

Protected Work A

Class A: Public street, road or thoroughfare, railway, navigable waterway, dock, wharf, pier or jetty, marketplace, public recreation and sports ground or other open place where the public is accustomed to assemble, open place of work in another occupancy, river-wall, seawall, reservoir, water main (above ground), radio or television transmitter, main electrical substation, private road which is the principal means of access to a church, chapel, college, school, hospital or factory.

Entry link: Protected Work A

Protected Work B

Class B: Dwelling house, public building, church, chapel, college, school, hospital, theatre, cinema or other building or structure where the public is accustomed to assemble, shop, factory, warehouse, store, building in which any person is employed in any trade or business, depot for the keeping of flammable or dangerous goods, major dam.

Entry link: Protected Work B

Pump Significant Incident

An ANE pump incident which involves sufficient overheating to be observed by pump operators (e.g. very hot pump body, visible smoke), or which causes the operation of a temperature protective element (temperature trip or thermofuse).

Entry link: Pump Significant Incident

Pyrotechnic

A substance or mixture of substances which will burn without relying on oxygen from external sources to sustain the reaction. Used as detonator delay train compounds.

Entry link: Pyrotechnic


Page:  1  2  3  4  (Next)
  ALL